First delivery for the PV

Got my first delivery (thank you Amazon)  pretty rapid. Living close to an Amazon (actually I think it’s more like 23) distribution point, means quick deliveries – usually next day.

Still have quite a lot of stuff ordered, but with luck the rest should arrive by the weekend. The first step is to fix the 40×40 Bosch profiles onto the well roof to be able to attack and fix the photovoltaic panels.

If all goes well (and the rain and wind stop) I could start this on Saturday

Share